Specifically, DOT did not document key decisions to (a) accept and review applications received after the published deadline; (b) advance projects with lower technical ratings instead of more highly-rated projects, and its procedures were inconsistent with DOT’s internal guidelines; and (c) change the technical ratings of lower-rated projects selected for funding to the highest technical rating category.Could not have played a part, right?
Conservative. Idaho. Software engineer. Historian. Trying to prevent Idiocracy from becoming a documentary.
Email complaints/requests about copyright infringement to clayton @ claytoncramer.com. Reminder: the last copyright troll that bothered me went bankrupt.
Pages
▼
Sunday, March 18, 2018
That Bridge Collapse
Reason points to a report about the federal program that funded it.
No comments:
Post a Comment